Underground Fuel Tank Installation Kenya

We supply and install double-wall fibreglass and steel underground storage tanks (USTs) that meet EPRA and NEMA requirements across Kenya.

Underground fuel tank installation Kenya

What's included

Underground Fuel Tank Installation Kenya - scope of work

Proper underground tank installation is the foundation of every safe petrol station. D'Zizi Petroleum Services supplies tanks in sizes from 10,000 to 40,000 litres and beyond, installs them to manufacturer specifications, and ensures full EPRA compliance. We handle excavation coordination, bedding, backfill, manhole and sump installation.

  • Double-wall fibreglass USTs - 10,000 L to 40,000 L and custom sizes
  • Steel underground storage tanks
  • Tank pit excavation and bedding coordination
  • Correct anti-buoyancy backfill and compaction
  • Manhole cover, sump and spill bucket installation
  • Tank vent, fill and product pipe connections
  • Overfill prevention valve and ATG probe installation
  • Pre-commissioning leak and pressure testing
  • EPRA and NEMA documentation support
  • Post-installation site restoration

How it works

Our process

1

Tank Selection

We advise on tank size, material and configuration based on your throughput and site layout.

2

Excavation & Bedding

Tank pit is excavated to correct depth, bedding material placed and compacted to specification.

3

Tank Installation

Tank is lowered, positioned, backfilled and anti-buoyancy measures applied where required.

4

Connections & Testing

All pipework, sumps and ATG probes are connected. Pre-commissioning hydrotest is performed and certified.

FAQ

Common questions

What size underground tanks do you install in Kenya?+

We install tanks from 10,000 litres to 40,000 litres as standard, and can source larger custom tanks for high-throughput sites.

Double-wall or single-wall tanks - which do you recommend?+

Double-wall (twin-walled) fibreglass tanks are the EPRA-preferred standard for new installations in Kenya, as they provide leak containment in the interstitial space and meet modern environmental requirements.

Do you also handle the excavation?+

We coordinate with civil contractors for excavation and oversee the bedding and backfill to ensure the tank is correctly installed.

What testing do you carry out after installation?+

We perform a pre-commissioning hydrotest on the tank and pipework, generate a certified test report, and prepare EPRA documentation.